Highway 101 – Santa Maria River Bridge

decorative background

Project funding

  • Project Sponsor: SBCAG and the California Department of Transportation (Caltrans)
  • Project Cost (at completion): $46.8 million
  • Measure A Funding Amount: $7.9 million
  • Estimated Non-Measure A Funding Amount: $38.9 million (STIP, ITIP and Proposition 1B)

Status


The project was completed in 2015 and widened the Highway 101 Bridge over the Santa Maria River from 4 to 6 lanes to conform to the 6-lane configuration to the south through the City of Santa Maria. The project also constructed a Class I bike and pedestrian path along the southbound lanes of Highway 101.