Highway 101 – Santa Maria River Bridge

decorative background

Project funding

  • Project Sponsor: SBCAG and the California Department of Transportation (Caltrans)
  • Project Cost (at completion): $46.8 million
  • Measure A Funding Amount: $7.9 million
  • Estimated Non-Measure A Funding Amount: $38.9 million (STIP, ITIP and Proposition 1B)

Status

  • Planning
    Approval
  • Environmental
    Demolition
  • Design
    Construction
  • Construction
    Phase
  • Completion
    Phase

The project was completed in 2015 and widened the Highway 101 Bridge over the Santa Maria River from 4 to 6 lanes to conform to the 6-lane configuration to the south through the City of Santa Maria. The project also constructed a Class I bike and pedestrian path along the southbound lanes of Highway 101.

Additional Resources

Sign up for the latest news

Name
This field is for validation purposes and should be left unchanged.
Agendas
This site is registered on wpml.org as a development site.